The objective is: 
39104
The running time is: 
94.8952
The time meeting best is: 
87.7639
Location: 2(load: 190) 
 Route 0(load: 140) 19 6 14 15 9 1 17 0 16 
 Route 1(load: 50) 7 18 2 
Location: 3(load: 118) 
 Route 0(load: 118) 11 12 4 13 10 3 8 5 
The actual cost is 39104
